Preceding methodのメーカーや取扱い企業、製品情報、参考価格、ランキングをまとめています。
イプロスは、 製造業 BtoB における情報を集めた国内最大級の技術データベースサイトです。

Preceding method - メーカー・企業と業務用製品 | イプロスものづくり

Preceding methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Next-generation bed pre-construction method "DFP Method"

A new concept that enables the movement of flexible partition walls! Introducing the next-generation floor-first construction method.

The "DFP Method" is a next-generation floor-first construction method that employs a newly developed "detachable support base" for reinforcement adjusters. It allows for the installation of reinforcement adjusters under the floor without removing the pace panels, as well as the removal of panels from below. By using this method, there is no need to break the pre-floor when moving partition walls, making it easier to relocate walls and extending the period for plan changes during new construction, as well as reducing flooring costs and shortening construction time during renovations. 【Features】 ■ A new concept that enables flexible movement of partition walls ■ Adoption of reinforcement adjusters using the newly developed "detachable support base" ■ No need to break the pre-floor when moving partition walls ■ Reduction of flooring costs and shortening of construction time during renovations *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Preceding method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録